My Guides
Completed Guides
Guide Comments
Reputation over time
Reputation Breakdown
Event | Count | Delta |
---|---|---|
Admin approved your guide | 16 | 1800 |
Someone completed your guide | 32 | 840 |
Admin approved your wiki | 2 | 85 |
Categorization accepted | 23 | 23 |
2
27 cm is used between LCD controller and Mainboard.
Please use m3x6 we will add this information.
On the last step there is a description about it. Unfortunately picture does not make it clear as it looks like a single piece when connected. We put an arrow on the corresponding pin.
Thank you for the heads up. Please find it under the Heated Bed Assembly instructions.
10 | Heatbed Assembly
Thank you for the feedback. Sorry to hear that. Let's see what we can do to improve this process. Maybe a screen recording video will be helpful.
Sorry to hear that you have struggles with downloading firmware.bin file. We have checked and the file is downloading fine. Maybe it was a temporary glitch on your connection. You can always ask us to help if similar issues happen. We can send you the necessary files asap. The SD card will be used for flashing the LCD as well. And also We don't want to confuse users by adding multiple fimrware.bin files to the SD card, instead we want them to chose and download according to their preference. If you still can't figure out how, please send us an email to support zaribo.com we will be happy to help.
There are no slots for M3 nuts on the back of the electronics housing body. You mount it to the DIN rail with the square nut holders. So no need to do somthing like that in this step.
Those screw slot depths have been improved. Thank you
Fixed that, thank you:)
Noted, we will report back about this loose ferrule. Glad that you sorted it out. Thank you.
Page 1 of 5
Next